Procurement · 01 / 05
Requirements
The approved design defines every package and bulk material: columns, vessels, rotating equipment and piping.
Equipment, vendor packages and bulk materials, purchased, expedited and inspected.

Procurement · 01 / 05
The approved design defines every package and bulk material: columns, vessels, rotating equipment and piping.
The approved design defines every package and bulk material: columns, vessels, rotating equipment and piping.
Materials, equipment and vendor packages are specified, sourced and expedited against the engineered design.
Equipment and packages are inspected and tested before they are shipped to site.
Packages are shipped, cleared at the port and carried to site by transport, including heavy haul where required.
Every package reaches the site laydown yard, ready for installation.
What we do

01
Material requisitions, technical bid evaluation and purchase orders for equipment, vendor packages and bulk materials, then expediting of every order from award to delivery.

02
Vendor documents are reviewed against the order, and equipment and packages pass factory acceptance tests and third-party inspection where specified before they are released for shipment.
How we deliver
Every order carries the specification of the approved design, from requisition to purchase order.
Deliveries are planned with construction, so packages reach the site laydown yard in the installation sequence.
Projects
Projects where SPEC carried out procurement.

2 × 8,500 BPSD · Najaf, Iraq

8,500 BPSD · Arbat, Sulaymaniyah, Iraq

30 MMSCFD · Ebedei, Ukwuani, Nigeria

6,500 BPSD · Sulaymaniyah, Iraq

30 MMSCFD · Mehar, Pakistan

14,400 BPSD · Kirkuk, Iraq