Construction

Construction, step by step

Construction · 01 / 05

Site preparation

The plot is cleared and graded, with the site camp, laydown yard and access roads in place before construction starts.

Skip to what we do
  1. 01

    Site preparation

    The plot is cleared and graded, with the site camp, laydown yard and access roads in place before construction starts.

  2. 02

    Foundations and steel

    Foundations are set out to the plot plan and cast, then pipe-rack bays and structural steel are erected.

  3. 03

    Equipment installation

    Columns, vessels and modules are lifted onto their foundations to engineered lift plans, in a planned sequence.

  4. 04

    Piping and tie-ins

    Process piping, utilities and platforms connect every area to the pipe rack.

  5. 05

    Mechanical completion

    Each area is checked and completed, and the facility is ready for commissioning.

What we do

Delivered, installed
and hooked up on site.

01

Transport & clearance

Equipment and modules are shipped, cleared through customs and delivered to site.

02

Installation

Lift planning and heavy lifts for columns, vessels and modules.

03

Site construction

Modules are hooked up and the supporting plant is built around them where it is in SPEC’s scope: pipe racks and interconnections, roads and drainage, control rooms and buildings, substations and power distribution.

How we deliver

How the site
is built.

  1. 01

    Welding and testing to qualified procedures, with each area checked and completed.

  2. 02

    Mechanical completion is handed to commissioning system by system, ready for pre-commissioning.

  • Civil & structural
  • Mechanical & piping
  • Electrical & instrumentation
  • QA/QC
  • QHSE

Projects

Selected projects

Projects where SPEC carried out construction.

View project references

Contact us

Talk to SPEC about
your construction scope.